Shawnee, Kansas · Custom Tile

Custom Tile Installation in Shawnee, KS

Porcelain and ceramic tile for the rooms that get wet. Showers and tub surrounds, bathroom and mudroom floors, kitchen backsplashes and the repair work that comes from somebody else’s shortcut. Waterproofing certified installers, a leak-free guarantee on every shower we build, and an itemised flat-rate quote within 24 hours.

Part of our wider custom tile services across the Kansas City area.

White subway tile shower laid in a running bond pattern with an aged brass shower head and valve, seen through a black-framed glass door Shower & surround
Glossy handmade-look tile laid in a herringbone pattern as a kitchen backsplash behind a gas range, under a navy hood Backsplash
Large-format marble-look porcelain floor tile laid in an offset pattern through a bathroom doorway Floor tile
Leak-free guaranteeOn the waterproofing assembly in every shower we build, start to finish.
Waterproofing certifiedOur tile specialists hold a separate waterproofing certification, not just tile experience.
Licensed & insuredLiability and workers’ compensation coverage on every Shawnee job site.
No showroom markupBuy your own tile wherever you like. We quote the installation, not the product.
Why Shawnee is two jobs, not one

A City That Was Built Twice

Shawnee was laid out in 1857 and burned to the ground by Quantrill’s raiders in 1862. By 1950 it still held only 845 people. Then it grew more than tenfold in a single decade, and it has not stopped since — 47,996 residents in 2000, 67,311 by 2020, across 26,465 homes and forty-two square miles.

What that leaves is a city with two completely different tile problems, split roughly at Nieman Road.

East of Nieman, the houses are 1950s to 1970s ranches whose bathrooms are on their first or second renovation in sixty years. Small rooms, tile set into a mortar bed or straight onto plywood, a crack that runs the length of a joist, and a wet wall that has been quietly soft for a decade behind a surround nobody wanted to open up. The interesting work there is underneath.

West toward K-7, the builds are newer and the work is about scale and specification: large-format floors running through entries and mudrooms, and primary showers with benches, niches and frameless glass that have to be waterproofed as a system rather than a surface.

We do both, out of Prairie Village, with the same crews. Read more about our custom tile services, or see every area we cover.

A Midwest Flooring installer setting patterned floor tile with levelling clips over a waterproofing board on a Shawnee, Kansas job site Shawnee, KS
Patterned floor tile going down over a bonded waterproofing board, with levelling clips holding lippage out — Shawnee, KS.
What we tile

Four Jobs We Run Most in Shawnee

Every one of them is quoted as a flat rate before anyone opens a box of tile.

Grey subway tile shower walls with a recessed niche tiled in white hexagon mosaic, a stone bench and a white hexagon mosaic shower floor

Showers & tub surrounds

The biggest job on this page and the one with the most hidden in it. Pre-sloped pan, bonded membrane, reinforced corners, a niche waterproofed as its own box, and a bench that drains rather than pools. Every shower is flood tested before a single tile goes on.

See how we build one
Large-format marble-look porcelain floor tile in an offset layout running from a bathroom through a doorway

Bathroom, mudroom & entry floors

Porcelain floors in the rooms that take snow melt, road salt and wet dogs off the driveway. Large format needs a flat floor before it needs anything else, so we check with a straightedge and level the substrate before we quote the tile rather than after.

Compare layouts
Stacked stone ledger tile backsplash running behind a range and around a corner in a white kitchen with stone countertops

Kitchen backsplashes

The cheapest square footage in the house to make interesting, and the fastest job we run — usually one to two days. Outlets get cut cleanly, the run gets laid out so cut tiles land in the corners, and the pattern is centred on the range rather than on whichever wall was convenient.

Explore custom tile
An installer back-buttering and setting floor tile with spacers and levelling clips over a prepared substrate in Shawnee, Kansas

Cracked grout, loose & hollow tile

Grout that keeps coming back out, tiles that sound hollow underfoot, a crack running in a straight line. These are movement and coverage problems, not grout problems, and re-grouting buys a season. We find what is moving, then fix that.

Read the diagnosis guide
Layout changes the price

Pick a Pattern, See What It Costs

The same tile in a different layout can move a quote by a third. Choose a pattern to see the waste factor, the labour band it falls into, and where we would actually use it.

Straight lay (stack bond)

~5% wasteStandard labour bandMost grout joints

Tiles line up in a grid, joints running straight in both directions. It is the cleanest, most contemporary layout and by far the least forgiving: every joint lines up with the next, so a wall that is out of square or a batch of tile that varies in size announces itself immediately.

We laser a control line and dry-lay the first course rather than starting in a corner and hoping, because in a straight lay the error at the far wall is the sum of every joint before it.

Where we use it: contemporary bathrooms, large-format shower walls, and feature panels where the tile itself is doing the work.

Running bond (offset)

~5% wasteStandard labour bandHides variation

Each row shifted along, the way brick is laid. It forgives small size variation between tiles and small errors in a wall, which is exactly why it is the default for subway tile and why it suits the older bathrooms east of Nieman Road where nothing is quite square any more.

One caution: on long tiles, a full half-tile offset can telegraph lippage, because the high point of one tile lands at the centre of its neighbour. On anything over about twelve inches we drop the offset to a third.

Where we use it: shower walls and tub surrounds, backsplashes, and any 1950s to 1970s Shawnee bathroom being brought back.

Herringbone

12–15% wasteComplex-pattern labourHighest cut count

Tiles set at forty-five degrees in interlocking pairs. It is the most requested feature layout we install and the most cutting by a wide margin — every edge of the room becomes a diagonal cut, which is where both the extra material and the extra labour go.

That combination moves it out of the $5 to $8 per square foot band and into $10 to $15. Worth every cent on a backsplash or an entry; expensive spread across a whole floor.

Where we use it: kitchen backsplashes, entry and powder-room floors, shower niches and accent bands. See our guide to chevron versus herringbone for how the two differ.

Vertical stack

~5% wasteStandard labour bandDraws the eye up

Subway tile turned on end. It makes a low ceiling read taller, which is genuinely useful in a 1960s Shawnee bathroom with an eight-foot ceiling and a tub surround that stops halfway up the wall.

It does need plumb walls. Vertical joints reveal a lean that horizontal joints hide, so if the framing is out we either shim and re-board it or steer you back to a horizontal layout — and we say which at the estimate.

Where we use it: tub surrounds, shower walls in narrow bathrooms, and half-height wainscot behind a vanity.

Large format

~8% wasteFlattest substrate requiredFewest grout joints

Tiles fifteen inches or larger on a side. Fewer joints means less grout to clean and a calmer, more expensive-looking floor — which is why it dominates the newer builds west toward K-7.

The trade is that large tile is unforgiving of a substrate that is not flat. Lippage that would vanish on a four-inch tile is obvious on a twenty-four-inch one. We back-butter for full coverage, use levelling clips across the whole field, and level the floor first rather than trying to bury the problem in mortar.

Where we use it: bathroom, mudroom and entry floors, and open shower walls where fewer joints is the entire point.
The part nobody sees

Where Showers Actually Leak

Tile is not waterproof and grout never was. The assembly behind them is, and it fails in five predictable places. Here is each one, and what we do about it.

Five failure points, five details

Almost every leaking shower we are called out to repair failed at one of these. None of them is exotic; all of them are skipped when a job is priced to be the cheapest quote in the stack.

Where it fails — the pan

A pan that is flat, or sloped only in the mortar above the liner, holds water against the substrate indefinitely. It never dries, and the first sign is a smell rather than a stain.

What we do

A pre-slope goes in under the waterproofing, so any water that gets past the tile still runs to the drain instead of sitting. The tile bed is then sloped again on top of it. Two slopes, not one.

Where it fails — inside corners

Membrane that is simply rolled or troweled into a corner cracks there first, because every change of plane is where the building moves. It is the single most common leak we are asked to chase.

What we do

Pre-formed corners and reinforcing band bonded into every inside corner and every change of plane, including where the wall meets the pan and where the curb meets the wall. Not painted over — bedded in.

Where it fails — the niche

A niche is a hole cut into a wet wall. Built as an afterthought it is a shelf that collects water and a gap in the waterproofing at exactly the height where water runs down the wall.

What we do

The niche is waterproofed as its own sealed box, tied back into the wall membrane, and the sill is sloped so shampoo bottles drain rather than stand in a puddle.

Where it fails — penetrations

Every valve, mixer and shower arm is a deliberate hole straight through the membrane. Mixing components from different waterproofing manufacturers voids the warranty on both, and most people never find out until it matters.

What we do

Each penetration sealed with the gaskets and sealant from the same system as the membrane, and we stay inside one manufacturer’s system for the whole shower so the warranty stays intact.

Where it fails — the curb and door

Water tracks along the top of a curb and finds the door jamb, then runs out onto the bathroom floor. The tile looks perfect and the subfloor outside the shower quietly rots.

What we do

The curb is wrapped on all three faces and pitched back into the shower, and the glass is set so the door sheds inward. Changes of plane get silicone, not grout, because grout cracks where things move.

Then we flood test it. The drain is plugged, the pan is filled, and it sits for twenty-four hours before a single tile goes on. A leak found on day two costs nothing. A leak found in year two costs a ceiling.

Book a Free Estimate

Not Sure What Is Behind Your Tile?

Neither is anyone, until somebody pulls a piece and looks. That happens at the free estimate: we check the substrate, sound the floor for hollow spots, and tell you whether you have a grout problem, a movement problem or a water problem — before anyone quotes a number.

Request Your Free Estimate
Start to finish

How a Shawnee Tile Project Runs

Five stages, one project lead, and a schedule set by cure times rather than optimism.

Free in-home measure

A project lead measures the space, sounds the existing floor for hollow spots, checks walls for plumb and square, and looks for what failed last time. Thirty to forty-five minutes, evenings and weekends available.

Layout, material & quote

Pattern, tile size and grout colour decided together, then an itemised flat-rate quote within 24 hours. We calculate exact quantities including the waste factor for your chosen layout and tell you how much to buy.

Demolition & substrate

Old tile out and hauled away, then the honest part: wet walls opened up, soft framing replaced, floors stiffened or levelled, and an uncoupling layer where a floor is going to keep moving.

Waterproofing & flood test

Pre-slope, bonded membrane, reinforced corners, sealed penetrations and a waterproofed niche. Then the pan is plugged, filled and left for twenty-four hours before anything is tiled over it.

Set, grout & walk it

Back-buttered for full coverage, levelling clips across the field, grout and sealant given their cure time, silicone at every change of plane. Then a room-by-room walkthrough before the balance is due. See our full process.

Before you book

Shawnee Tile Questions We Get Asked Most

Straight answers to the six that come up on nearly every estimate.

What does tile installation cost in Shawnee?
Installation labour runs $5 to $15 per square foot. A standard floor in a straight or offset layout sits at the $5 to $8 end; herringbone, mosaics and other complex patterns run $10 to $15 because almost every edge becomes a cut. Shower waterproofing is included in our installation price rather than billed as an extra. Material stays entirely in your control because we do not run a showroom and do not mark up product — ceramic typically runs $2 to $8 per square foot and porcelain $3 to $12, bought from whichever local supplier you prefer. What moves a quote most is what is behind and beneath the tile: a wet wall that has gone soft, or a floor that has to be levelled before large-format tile can sit flat.
The grout in our 1960s bathroom is cracked in a straight line. Do we need a whole new floor?
A crack that runs in a straight line, especially one that follows a joist, is almost never a grout problem. It is the floor underneath moving, and re-grouting it will buy you a season at most. In a Shawnee ranch of that age it usually means the subfloor is too thin or too flexible for the span, or the tile was set directly to plywood without an uncoupling or crack-isolation layer. The fix is to open it up, stiffen or replace the substrate, and set the new tile over a membrane that lets the floor move without taking the tile with it. Hollow-sounding tiles and grout that keeps coming back out are the two other tells, and we check both at the estimate.
How long does a tile shower take, and can we use the bathroom?
A full shower is usually five to eight working days, and the calendar is set by cure times rather than by labour. Demolition and substrate work take a day or two, waterproofing needs to cure before it is flood tested, tile setting takes two to three days, and grout and sealant need their own cure before the shower is used. That bathroom is out of service for the duration. If it is the only bathroom in the house we phase the work and tell you honestly which nights will be difficult, rather than discovering it together on day three.
What does the leak-free guarantee actually cover?
Every shower we build carries a leak-free guarantee on the waterproofing assembly we install: the pre-sloped pan, the bonded membrane, the reinforced corners and changes of plane, the niche, and every penetration through it. If water gets past that assembly, we come back and make it right. It sits alongside the 1-Year Workmanship Warranty that covers our labour and installation quality generally. What it does not cover is a failure that starts somewhere else — a valve body leaking inside the wall, a supply line, or a glass door installed by someone else — and we will tell you which one you have before anyone starts taking tile off.
Do I need a City of Shawnee permit for a tile job?
For tile itself, no. The City of Shawnee treats cosmetic interior remodelling — including replacing floor covering and swapping plumbing fixtures — as work that does not require a permit. Permits are required for new construction, additions, alterations and repairs, and for all electrical, plumbing, mechanical and gas work. In practice that means a tile floor or a backsplash is exempt, while a shower remodel that relocates the drain or moves a valve is not. The city currently enforces the 2018 International Codes with the 2017 National Electrical Code, effective July 1, 2019. We tell you at the estimate which side of that line your project sits on and coordinate with the Building Codes Division when it crosses.
Does the tile pattern really change the price that much?
Yes, and in two separate ways. Material waste goes up because pattern layouts end in diagonal cuts: figure about 5 percent extra for a straight or offset layout, 8 percent for large format, and 12 to 15 percent for herringbone. Labour goes up separately, because complex patterns move from the $5 to $8 per square foot band into the $10 to $15 band. The practical answer for most Shawnee homes is to spend the pattern budget where it is seen — a backsplash, an entry, a shower niche or an accent band — and run a simpler layout across the large floor areas. We price both options at the estimate so the comparison is in front of you rather than described.

Get a Free Tile Estimate in Shawnee

Tell us the room, the address and roughly what you have in mind. A project lead comes out, checks what is behind and beneath the tile, and sends an itemised flat-rate quote within 24 hours — with no obligation attached to any of it.

Waterproofing certified · Leak-free guarantee on every shower · 1-Year Workmanship Warranty

Sources

Shawnee population counts, housing unit total, land area and founding history: U.S. Census Bureau decennial censuses (2000, 2010, 2020) and city records. Permit exemptions for cosmetic interior remodelling, the work that does require a permit, and the adopted 2018 International Codes with the 2017 National Electrical Code effective July 1, 2019: City of Shawnee Building Permits and Inspections. Substrate flatness, movement accommodation and lippage guidance follows ANSI A108 standards and TCNA handbook practice. Waterproofing details follow the manufacturer instructions for the bonded membrane system used on each job. Per-square-foot pricing ranges: our own published pricing.